常用生管物控专用术语
1.A/M—action memo.
2.AVL—avail vendor list
3.ASSY—assemble
4.BOM—bill of material
5.BFM—buy from
6.BU—business unit
7.BIOS— basic input/output system
8.CFM—consign from
9.CCB— change control board
10.DOA— dead on arrival
11.DVT— design verification test
12.DC—document center
13.DIMM—sdram
14.ETA—estimate time of arrival
15.ETD—estimate time of deliver
16.ERP—enterprise resource plan
17.EVT— Engineering Value Test
18.EBOM— engineering bill of material
19.ECO—engineering change order
20.ECR—engineering change requirement
21.EDI— electronic data interchange
22.ECN—engineer change note
23.FIFO—first in, first out
24.F/T—function test
25.JIT—just in time
26.KC—key component
27.L/T—lead time
28.MRP—material require plan
29.MPS—master production schedule
30.MDS—master demand schedule
31.MN—manufacturing notice
32.MP—mater production
33.MO—manufacturing order
34.MBOM—manufacturing bill of material
35.MFG—manufacturing
36.MPI—manufacturing process instruction#p#副标题#e#
37.MTD—month till today
38.MRB—-material review board
39.OPT—output till today
40.OU—operation unit
41.O/H—overhead
42.O/T—work over time
43.ODM— original design manufacturing
44.PCBA—PWA— assemblied pcb
45.PHANTON—sub-assy code
46.PVT— Production Value Test
47.PMR— problem material review report
48.P/S—production and sales meeting
49.QVL—qualified vendor list
50.IQC— incoming quality control
51.OQA— out going quality assurance
52.PQE—production quality engineer
53.IPQA—in process quality assurance
54.RMA— return material authorization
55.SMT—表面贴装技术
56.SA—sales authorization
57.SI—sales instruction
58.SOP—standard operation procedure
59.T/S—trouble shooting
60.WIP—work in process
61.W/O—work order
62.W/H—warehouse
63.OEM— original equipment manufacturing
64.STD—standard
65.I/S ratio—inventory amt / sales amt
66.DPPM—defect percentage per million
67.OFD—order fulfill department
68.OP—order processor
69.PD—purchase dep.
70.PC—production control
71.MC—material control
72.R&D—research and development
73.LMD—logistic management dep. 资材部